(March 2015 – May 2015)
Niepe Construction was contracted by RoadTek to assist with the construction of four headwalls in the Lockyer Valley. The works revolved around two existing pipe crossings under the Warrego Highway that consisted of twin 2300mm diameter concrete pipes.