Niepe Construction assisted Fulton Hogan in the upgrading of the Leslie Harrison Dam on the Tingalpa Reservoir. FRP works included the construction of access shafts, outlet pipe enveloper pipes and drainage structures. Niepe also assisted with the installation of an incrementally launched baily bridge over the dam’s main spillway