Niepe was engaged by Skyway to construct a 3-span bridge with a cast insitu concrete substructure, a precast deck unit superstructure with a cast insitu deck. Our innovative temporary works solution enabled us to construct the superstructure without the use of a temporary girder walkway, saving the client time and money.