Antoun Expedient Pavements
Antoun Expedient Pavements
Niepe were engaged by Antoun to deliver six slabs in six nights at Logan Hyperdome’s Bus Platform. The works were performed during nightshift using their proprietary expedient concrete, with no disruptions to existing bus traffic or scheduling.
Niepe have also been engaged to complete a series of Airport Pavement repairs at the Brisbane Airport, with Antoun’s expedient pavement mix, this involves the removal and replacement of taxiway slabs in a single nightshift ready for Airport operations to resume the following morning.
Scope:
Expedient pavements
Client:
Antoun/Department of Main Roads
Year:
2023
Gateway Upgrade Project
Gateway Upgrade Project
(August 2007 – June 2012)
Involved in the construction of various structures within the southern section of the works including CROP railway bridge, Wynnum Road Bridge, Old Cleveland Road Bridge and a number of associated works including in situ barriers, gantry bases and RC retaining walls. The works on the southern section involved a number of green field structures and widening of existing structures which required flexibility in work hours and shifts to meet the requirements of the project deed.
Works also included set up of various site compounds including concrete slabs and shed and awning installation.
RoadTek – Marburg culvert end structure
RoadTek – Marburg culvert end structure
(March 2015 – May 2015)
Niepe Construction was contracted by RoadTek to assist with the construction of four headwalls in the Lockyer Valley. The works revolved around two existing pipe crossings under the Warrego Highway that consisted of twin 2300mm diameter concrete pipes.
Our work in this project includes
- Detailed Excavation of toe walls
- Installation of Reinforcing
- Erection of Formwork
- Placement of Structural Concrete
- Form, Reo and Pour of concrete lined drains
- Backfill to Concrete structures
- Landscaping of completed works
- Installation of fencing
Trackstar Alliance
Trackstar Alliance
(March 2012)
Engaged to construct six bridges and the Springfield Station arched structure shown below. We faced many challenges associated with the construction of the arch piers in the Springfield Station including sourcing a formwork design which would meet the tight Trackstar program and budget and eventually we decided on a modular travelling system.
Niepe is also engaged to construct various other structures throughout the project including abutments, capping beams, columns, headstocks and deck slabs. Site challenges involve working in a congested, multi-disciplinary area with compressed programs and multiple crews and bridges occurring concurrently.
This project includes
- Construction of 6 Bridges
- Construction of Springfield Station Arch Pier System
- Used a modular travelling form work system
- Challenging major project
- Abutments, capping beams, columns, headstocks and deck slabs
- Bridges occurring concurrently
Boondooma Dam
Boondooma Dam
(2017-2018)
Niepe Construction was involved in the upgrade of Boondooma Dam. This included upgrades to its spillway, structural elements and construction of relevant access.
Our tasks in this project includes
- Removal of rock and application of anchors
- Construction of a Spillway Defence System
- FRP of Structural elements
- Concrete lining of Spillway walls
- Pavement for access